GovWire

Avanti West Coast awarded long-term contract after significant improvements for passengers

Department For Transport

September 19
06:21 2023

  • Avanti West Coast awarded long-term contract following significant improvements across reliability, punctuality and customer satisfaction
  • Transport Secretary and Rail Minister continue to recognise the vital routes Avanti West Coast serve and the need for passenger confidence
  • new contract separately awarded to Cross Country which will bring improved services and refreshed train fleets for passengers

The Department for Transport has today (19 September 2023) awarded Avanti West Coast a long-term contract which will enable them to deliver improved services for passengers, after dramatically reducing cancellations to as low as 1.1% over the past year.

A long-term contract will allow the operator to plan ahead, giving them the certainty they need to prepare advance timetables, roll out new train fleets and continue their work to improve services benefitting passengers in both the short and long term.

This comes after the department placed Avanti West Coast on 2 consecutive short-term, 6-month contracts and ordered them to develop a recovery plan aimed at addressing poor performance on vital routes including between Manchester, Birmingham and London which were brought on by a shortage of available drivers.

Alongside the recovery plan which prioritised training new drivers, reducing reliance on rest day working and getting tickets on sale earlier, a recovery timetable was introduced which has seen services increase from 180 trains per day to 264 on weekdays the highest level in over 2 years.

By the end of the first 6-month contract in March, Avanti had already made significant progress towards its recovery, with 40% more services being run and cancellations within Avantis control falling to 4.2%. Those arrangements were further extended to ensure these improvements would continue and passengers would feel confident in using the services again.

Since then, Avanti West Coasts services have seen further improvements:

  • cancellations have consistently been below 3% since March 2023, and as low as 1.1% in July 2023, down from 13% in January 2023
  • over 90% of trains now arrive within 15 minutes of their scheduled time, improved from 75% in December 2022
  • over 100 additional drivers have been trained and brought on since April 2022
  • improvements to passenger facilities on trains including better seats, lighting and charging points
  • the introduction of Travel Companion, a WhatsApp channel which passengers with accessibility needs can use to get real-time assistance and information on their journeys, allowing for a more seamless passenger experience for everyone

Transport Secretary Mark Harper said:

The routes Avanti West Coast operate provide vital connections, and passengers must feel confident that they can rely on the services to get them where they need to be at the right time.

Over the past year, short-term contracts were necessary to rebuild the timetable and reduce cancellations. Now Avanti are back on track, providing long-term certainty for both the operator and passengers will best ensure that improvements continue.

As well as working directly with the operator and local stakeholders on the recovery plan over the past year, the government continues to support the industry including through setting a mandate as it engages with unions to ensure we can take forward much-needed reform, including introducing a reliable 7 day a week service to secure the future of our railways. The transformation of Avantis performance over the past year demonstrates how, through working closely with government, setting out clear set goals and being incentivised to succeed, the private sector can deliver on our railways.

Starting on 15 October 2023, Avanti West Coasts new National Rail Contract will have a core term of 3 years and a maximum possible term of 9 years. After 3 years, the Transport Secretary can terminate the contract at any point with 3 months notice.

The department will stay in close contact with the operator and local stakeholders to monitor Avantis performance as it continues its progress to a sustained recovery.

Meanwhile, the department has also today awarded Cross Country a new National Rail Contract, with a core term of 4 years and a maximum possible term of 8 years.

The contract will also begin on 15 October and includes additions to help improve services, such as the replacement of the now-retired High Speed Trains with more modern equivalents, refurbishment of existing Cross Country train fleets, and the introduction of direct daily services between Cardiff and Yorkshire, the North East and Edinburgh from December 2024.

Rail media enquiries

Media enquiries 0300 7777878

Switchboard 0300 330 3000

Related Articles

Comments

  1. We don't have any comments for this article yet. Why not join in and start a discussion.

Write a Comment

Your name:
Your email:
Comments:

Post my comment

Recent Comments

Follow Us on Twitter

Share This


Enjoyed this? Why not share it with others if you've found it useful by using one of the tools below: