GovWire

1. When appropriate measures apply

Environment Agency

November 25
16:00 2024

class="gem-c-govspeak govuk-govspeak govuk-!-margin-bottom-0">

This guidance applies to aerobic and anaerobic processes including:

  • composting in open-air and closed (in vessel) systems
  • aerobic processing of organic fractions by mechanical and biological treatment (MBT) and mechanical heat treatment (MHT)
  • thermophilic aerobic digestion (TAD)
  • anaerobic digestion (AD) including the combustion or upgrading of the resulting biogas and treating the digestate (anaerobic treatment can include wet, dry and dry-batch digestion)
  • aerated lagoons and activated sludge (as a waste water treatment)
  • collecting and storing methane from lagoons and tanks and upgrading to biomethane
  • treating sewage sludge using any of these biological processes
  • storing feedstock, compost and digestate
  • receiving wastes destined for biological treatment

There is overlap between best available techniques (BAT) for waste installations and necessary measures for waste operations. The Environment Agency uses the term appropriate measures to cover both sets of requirements.

This guidance sets out what you must consider when you assess the appropriate measures for your facility. It is not definitive and it does not replace your obligation to assess appropriate measures fully for your site.

Some measures may not be suitable for or relevant to your operation. Appropriate measures will depend on the:

  • complexity of the activities being carried out
  • size and nature of the activities
  • location of the site

Where an operator wants to propose an alternative measure, this must achieve the same level of environmental protection. The operator must also provide evidence of why the alternative is equivalent to (or better than) what this guidance proposes.

In certain situations, a higher standard of environmental protection may be needed, for example:

  • where there are local sensitive receptors
  • if the facility is affecting the local environment or human health despite using appropriate measures
  • if there is a risk that you may breach an Environmental Quality Standard

Other technical guidance relating to emissions, odour and noise may also apply.

Where the biological treatment is directly connected or associated with another regulated activity or process, specific technical guidance may apply.

Operations that are permitted to accept, store, handle, treat or transfer the following wastes must also comply with the requirements in Chemical waste: appropriate measures for permitted facilities:

  • hazardous waste
  • mirror entry waste
  • laboratory smalls
  • chemicals

Combustion plant with a rated thermal input equal to or greater than 1 megawatt (but less than 50 megawatts) must have a permit and comply with the relevant requirements of the Medium Combustion Plant Directive (Directive (EU) 2015/2193). Specified generators which are used to generate electricity must also have a permit and comply with the relevant requirements of the specified generator regulations. Additional guidance is available from the Environment Agency.

1.1 The waste water treatment activities this guidance applies to

This guidance applies to the following activities for the waste water treatment sector, the:

  • biological treatment of waste water not covered by the Urban Waste Water Treatment Directive (UWWTD)
  • biological treatment of sludges, centrate liquors and other wastes generated by the waste water treatment process
  • importation of wastes or effluents (excluding sewage, sewage sludge and septic tank sludge) to the works where they are fed into the UWWTD biological treatment process

1.2 When this guidance applies to a specific process

Where measures apply to all processes and operations this is stated.Where measures are process-specific this is stated.

1.3 Implementing appropriate measures at new and existing facilities

The appropriate measures in this guidance apply to both new and existing facilities that treat biodegradable and organic waste.

New facilities

All new facilities must implement the relevant appropriate measures, or a fully justified equivalent. These must be in place before waste treatment operations start.

New installations (including new or replacement plant at existing facilities) must comply with any relevant best available technique (BAT) associated emission level (AEL) as set out in the published Waste Treatment BAT Conclusions document. They must do this from the start of their operations, unless we approve a derogation.

Existing facilities

Installations permitted after 17 August 2018 must already be BAT compliant.

Existing installations permitted before 17 August 2018 must comply with the BREF and BAT AELs by 17 August 2022.

Where operators are unlikely to comply with a BAT

Related Articles

Comments

  1. We don't have any comments for this article yet. Why not join in and start a discussion.

Write a Comment

Your name:
Your email:
Comments:

Post my comment

Recent Comments

Follow Us on Twitter

Share This


Enjoyed this? Why not share it with others if you've found it useful by using one of the tools below: