Report 12/2024: Collision between a road-rail vehicle and a trolley near Brading

Rail Accident Investigation Branch

October 24
14:05 2024

class="gem-c-govspeak govuk-govspeak govuk-!-margin-bottom-0">

R122024_241024_Brading

Summary

At around 01:50 on Wednesday 22 November 2023, a road-rail vehicle, travelling in a work site, collided with a hand trolley being used by a work group on the Isle of Wights Island Line. The road-rail vehicle was being used to clear vegetation and was travelling between its work locations when the collision occurred.

The road-rail vehicle was approaching the work group, who were repairing the track, on a descending gradient and was unable to stop before their site of work. When members of the work group realised that the road-rail vehicle was not stopping, they removed tools and equipment from the trolley and lifted it off the track. However, once removed, the trolley was inadvertently left too close to the track and remained foul of the road-rail vehicles path. The road-rail vehicle then collided with the hand trolley.

As a result of the collision, the trolley struck two members of the track repair work group on the legs, pushing them into bushes beside the track. Both received minor injuries, attended hospital independently later that day and were then discharged. The collision was caused because the controller of site safety responsible for the track work group had not been informed of the road-rail vehicles movement before it approached, and because the road-rail vehicle was unable to stop in the expected distance once the machine operator realised the work group was ahead.

Two underlying factors were that South Western Railway, the infrastructure manager for the track on the Island Line, did not have an effective process for planning and managing the risk of on-track plant movements, or for managing low adhesion risk for maintenance activities. A third underlying factor was that South Western Railways assurance processes had not identified informal working arrangements in possessions.

Since the accident, South Western Railway has updated its risk assessment for machine movements and introduced new control measures to specifically manage the risks of conflicting sites of work within work sites and possessions. It has also addressed the deficiencies found within its assurance process for monitoring how possessions are managed.

Recommendations

As a result of the investigation, RAIB has made three recommendations, all addressed to South Western Railway. The first is to review how it manages safety during infrastructure work on the Island Line. The second is to review its assurance processes and the third is to provide its infrastructure maintenance staff and contractors with accurate information about its infrastructure.

Additionally, three learning points have been identified. The first reinforces the importance of transport undertakings and on-track plant operators applying industry codes of practice in the event of an accident or incident involving on-track plant. The second concerns the importance of promptly reporting notifiable accidents to RAIB, and the third the importance of well-established process and procedure for dealing with post accident or incident evidence collection and testing.

Updates to this page

Published 24 October 2024