GovWire

Press release: UKAEA signs agreement with CV? to progress UK fusion plant design

Uk Atomic Energy Authority

May 2
15:18 2024

The UK Atomic Energy Authority (UKAEA) and Czech Republic research organisation Centrum vzkumu ?e (CV?), have signed a multi-year use of facility agreement to enable unique testing of High Temperature Superconducting (HTS) tapes, critical for the development of the UKs prototype fusion energy powerplant, the Spherical Tokamak for Energy Production (STEP).

UKAEA will work alongside CV? to deliver the first-of-a kind test rig called Hi-CrIS (High neutron fluence Cryogenic Irradiation of Superconductors). The arrangement will collect data on how a neutron spectrum relevant to fusion energy impacts the superconducting properties of the HTS tapes.

STEP plans to use these tapes to confine its fusion plasma, a superheated gas of hydrogen isotopes, in a tokamak. Under intense heat 150 million degrees celsius, ten times hotter than the core of the sun and pressure, the isotopes fuse into helium, releasing energy as neutrons.

The Hi-CrIS rig, expected to be operational in 2026, will produce test results for shaping the design and lifespan of STEPs superconducting magnetic components. These components will function under cryogenic temperatures (20 Kelvin / -253 C) and be subjected to high flux energy neutrons.

Under the agreement, samples of HTS tapes will be cooled to the same cryogenic temperatures. Maintaining this temperature during irradiation, transportation, and measurement is critical for understanding how the HTS tapes degrade in their operating environment.

The samples will be irradiated with high energy neutrons using CV?s LVR-15 light water tank-type research reactor and kept at 20 Kelvin during transportation and measurement within the rig.

Fiona Harden, Hi-CrIS Technical Lead said: We look forward to working with CV? to build and operate the test rig using their LVR-15 research reactor. The objectives of Hi-CrIS are critical to STEPs design and this importance is recognised by CV? who has worked openly with us to put this agreement in place.

Marek Miklos, Business Development Manager from CV? added: Working in partnership with the STEP team is a fantastic opportunity to support the UKs world-leading programme to develop a prototype fusion energy plant. The Hi-CrIS testing rig will open lots of opportunities for further material studies for fusion applications.

The Hi-CrIS test rig will have globally unique capabilities, enabling samples to be tested under high energy neutron fluences at cryogenic temperatures and could further develop the knowledge of superconductor components at operating temperatures. Hi-CrIS could also enable alternative materials testing for the potential development of future fusion powerplants.

STEP aims to demonstrate net energy from fusion and will be built at West Burton in Nottinghamshire, targeting operations in 2040.

Fusion could be transformative for energy supply: near-limitless fuel, low carbon, safe, and sustainable for the long term.

Jan Mil?k, Managing Director, Director of Reactor Operation Section (CV?), Fiona Harden, STEP Hi-CrIS Technical Lead (UKAEA) and Marek Miklos, Business Development Manager (CV?) touring JET facility at UKAEA's Culham Campus - Image credit: United Kingdom Atomic Energy Autho

Related Articles

Comments

  1. We don't have any comments for this article yet. Why not join in and start a discussion.

Write a Comment

Your name:
Your email:
Comments:

Post my comment

Recent Comments

Follow Us on Twitter

Share This


Enjoyed this? Why not share it with others if you've found it useful by using one of the tools below: