GovWire

Guidance: River Thames: restrictions and closures

Environment Agency

November 28
12:41 2024

class="gem-c-govspeak govuk-govspeak govuk-!-margin-bottom-0">

Before boating on the River Thames, you should check the current river conditions.

When Where Whats happening
27 November 2024 until further notice Culham Lock Culham Lock is currently closed due to flooding of lock chamber.
22 June 2024 until further notice Benson Lock Shoal reported downstream of lock. When navigating upstream the shoal is on the right hand side of the navigation channel. Boaters should navigate with caution when entering or exiting the tail gates.
23 April 2024 until further notice Caversham reach Submerged boat tied to left hand bank looking upstream, just upstream of St Marys Island. Boaters should navigate with caution.
20 April 2024 Until further notice Whitchurch head lock cut Obstruction to navigation above head gates. Boaters should navigate with caution when entering or exiting the upstream lock cut.
1 October 2023 until further notice Teddington Launch Lock Lock is closed for repairs to lock walls, gate ram trench and areas of the lock side.
Until further notice Clifton weir stream Shoal reported downstream of The Plough public house. Boaters are advised not to navigate up Clifton weir stream.
Until further notice Canal Bridge, Radcot A vehicle has damaged Canal Bridge, where Radcot Road A4095 crosses the River Thames. Please be cautious of falling debris if navigating near the bridge.
Until further notice Boulters Lock Gates on the pedestal side do not open fully. Width of the tail gates is restricted to no more than 5.5 metres (18). Please use caution when entering and exiting the lock.
Until further notice Botley Road Bridge, Oxford Obstruction to navigation 50 metres upstream of Botley Bridge. Boaters should navigate with extreme caution.

River closures: updated 28 November 2024

There are no current river closures planned.

River restrictions: updated 27 November 2024

When Where Whats happening
Tuesday 22 October 2024 to Friday 31 January 2025 Teddington reach Teddington Lock Footbridge repairs 2024: whilst this work is carried out the width of the channel may be reduced by up to one third.
Thursday 21 November 2024 until further notice Temple reach Temple Bridge safety works 2024: the central arch of Temple Bridge will be closed for navigation. Boaters can navigate via the two side arches.
Wednesday 27, Thursday 28, Friday 29, and Saturday 30 November 2024 Iffley reach Tamesis Regatta 2024: the navigation channel will be on the left side downstream, and the right side upstream.
Sunday 26 January, Sunday 16 February, Sunday 2 March 2025 Hambleden reach Henley Winter Series 2024: there will be no racing channel. Competitors will navigate the river correctly and safely whilst being aware of other river users.
Sunday 1 December 2024, Sunday 26 January, Sunday 9 February, and Sunday 4 May 2025 Iffley reach Isis Winter League 2024: in between races, a clear navigation channel will be in place along the centre of the river.
Saturday 7 December 2024, 9am to 4pm Sunbury reach Walton Small Boats Head 2024: the navigation channel will be on the old river and the Middlesex, right side of the river. The Desborough Channel will be closed for normal navigation.

Planned lock closures: updated 13 September 2024

The Environment Agency carries out a programme of works on the River Thames every year between October and the end of March. This results in the closure of a number of locks sometimes for relatively long periods.

The first issue of the programme is published 10 weeks in advance of the first planned lock closure. This is so that river users can plan their winter cruising and boat movements well in advance.

This programme of work is subject to change, due to weather and other circumstances. Revised issues of the programme of works are published throughout the winter, so river users can keep up to date. To receive this information, sign up to the email update service.

Investment programme November 2024 to March 2025.

When Where Work being carried out Canoe portage with care during closure
27 November 2024 to 16 December 2024 Buscot Lock Replacement of anchor blocks and collar straps. Yes
27 November 2024 to 3 January 2025 Whitchurch Lock Replacement of anchor blocks and collar straps. Yes
3 January 2025 to 3 February 2025 Sonning Lock Replacement of anchor blocks and collar straps. Yes
31 January 2025 to 7 March 2025 Marlow Lock Replacement of anchor blocks and collar straps. Yes
10 March 2025 to 1 April 2025 Romney Lock Replacement of anchor blocks and collar straps. Yes

Email updates and newsletter

You can subscribe to newsletters about navigation on the River Thames and email updates on River Thames closures and restrictions.

To subscribe to or unsubscribe from this service, email riverthames@environment-agency.gov.uk with subscribe or unsubscribe in the subject line.

Please say whether you want to subscribe to or unsubscribe from:- closures and restrictions emails- newsletter emails- both

We will use your personal information in line with our privacy notice.

Updates to this page

Published 12 February 2020
Last updated 28 November 2024 +show all updates
  1. Wallingford Winter Head (Sun 1 Dec 2024) has been cancelled due to strong stream conditions.

  2. Update to navigation issues. Culham Lock is currently closed due to flooding of lock chamber.

Related Articles

Comments

  1. We don't have any comments for this article yet. Why not join in and start a discussion.

Write a Comment

Your name:
Your email:
Comments:

Post my comment

Recent Comments

Follow Us on Twitter

Share This


Enjoyed this? Why not share it with others if you've found it useful by using one of the tools below: